Lumber Takeoff & Framing Estimating

Complete lumber takeoffs for wood-framed homes, multifamily and light commercial buildings, with studs, plates, headers, joists, trusses, sheathing and hardware counted piece by piece and delivered in 24–48 hours.

USAAUSTRALIACANADAUK
Lumber takeoff summaryCSI Division 06 · material list format
Sample
Scope itemMeasured in
Wall framingPCS · LFStuds, plates, blocking by size
Headers and beamsEASized from the framing plan and schedules
Floor and roof systemsEA · LFJoists, rafters, I-joists, trusses
Sheathing and hardwareSHT · EAOSB, plywood, hangers, straps
Organized by floor and wall lineDiv 06
1,000+Estimates delivered
12+Years of experience
24–48hTypical turnaround
100%CSI-formatted estimates
Lumber takeoff & framing

A lumber list your yard can quote from.

Lumber takeoff services from NYNMO Estimating give framing contractors, homebuilders and lumber yards a piece-by-piece material list for the wood structure of a building. Our estimators measure every wall line, floor and roof from your architectural and structural drawings, then count studs, plates, headers, joists, rafters, sheathing and hardware by size and length, so you can send the list straight to your supplier for pricing.

Framing is where a vague estimate costs real money. A wall measured in linear feet does not tell you how many studs sit at corners, intersections and openings, how many headers you need, or how much blocking the fire and shear details call for. Our takeoffs follow the way framers actually build, wall by wall and floor by floor, so the material on the list matches the material on the truck.

How we build a lumber takeoff

We review the floor plans, framing plans, sections, shear wall schedules and structural notes to confirm stud spacing, plate heights, header sizes and hold-down requirements. Wall lines are then measured in PlanSwift and Bluebeam, studs are counted at the specified spacing with extras at corners, openings and intersections, and floor and roof members are counted from the framing layout or truss drawings. Sheathing is calculated by sheet, hardware is listed by type, and material and labor are priced at your regional rates.

Scope we cover

Wood framing we take off.

From a single addition to a four-story podium building, each framing system is listed separately so you can price or order it your way.

01

Wall framing

Exterior and interior walls with studs, top and bottom plates, cripples, kings, jacks and blocking at the specified spacing.

02

Floor systems

Dimensional and engineered joists, rim board, beams, posts, subfloor sheathing and squash blocks.

03

Roof framing

Rafters, ceiling joists, ridge and hip members, or truss counts by type from the truss layout.

04

Sheathing

Wall, floor and roof sheathing by sheet type and thickness, with shear wall areas identified.

05

Hardware

Joist hangers, hurricane ties, straps, hold-downs, anchor bolts and fasteners from the structural schedules.

06

Finish carpentry

Exterior trim, fascia, soffit framing and backing for cabinets and fixtures, when included in your scope.

Residential & multifamily

Framing estimates for every wood-framed project.

Single-familyCustom homes, additions and production plans

For residential builders we take off custom homes, additions, ADUs and production plans. Takeoffs can be split by elevation or option, so you can price a bonus room or covered patio separately from the base plan.

Multifamily & light commercialApartments, podiums and mixed-use

For multifamily and light commercial projects we cover wood-framed apartments, podium buildings, townhomes, senior living and small retail, organized by building, level and unit type so framing crews can be scheduled floor by floor.

Protect your margin

Framing material that is easy to miss.

Most framing takeoffs come up short on the details rather than the walls. We list these items separately so they make it into your number:

  • Extra studs at corners, wall intersections, openings and point loads.
  • Blocking for fire separation, shear walls, cabinets, grab bars and fixtures.
  • Shear wall sheathing and nailing, which changes material and labor compared with standard walls.
  • Hold-downs, straps and anchor bolts called out in the structural schedules.
  • Beam pockets, flush beams and posts that only appear on the structural sheets.

Waste allowances are shown by material type, so you can adjust them to match your crews and supplier.

How it works

Three steps from plans to a priced bid.

1
DAY 0

Send your plans

Upload your drawings, specifications and bid date, and tell us which framing scope you need priced.

2
TAKEOFF + PRICING

We take off and price

Our estimators measure every framing item from the plans and price material and labor at current rates for your region.

3
24–48 HRS

Review and bid

You receive the Excel estimate and marked-up plans, ask for any changes, and submit your bid with confidence.

Who it's for

Built for the people who bid framing.

Our lumber takeoffs fit framers, builders and suppliers who need an accurate wood package fast.

Framing contractors

Bid more framing packages and price labor from real piece counts.

Homebuilders

Get a material list for each plan and option before you release a lot.

Lumber yards

Quote packages accurately and win more builder accounts.

General contractors

Check framing bids and carry a reliable wood package budget.

Why outsource

Why builders outsource lumber takeoffs.

A complete lumber takeoff for a large home or a multifamily building can take a full day or more by hand, and lumber prices move fast enough that a slow quote can cost you the job. Outsourcing gives you a detailed list in a day or two, so you can lock pricing with your supplier sooner.

Framing ties into several other trades, so many clients add our drywall, roofing and insulation estimates on the same project. Builders with steady volume often work with a dedicated estimator who learns their plans and options.

FAQ

Common questions about lumber takeoffs.

Answers to the questions contractors ask most before ordering an estimate.

What is included in a lumber takeoff?

A lumber takeoff lists every framing member by size and length, including studs, plates, headers, beams, joists, rafters or trusses, blocking and sheathing, plus framing hardware from the structural schedules.

Do you count studs individually?

Yes. Studs are counted at the specified spacing for each wall line, with additional studs added at corners, intersections and openings, rather than estimated from a linear-foot factor.

Can you take off trusses?

If truss drawings are available, we count trusses by type. If not, we list roof framing from the plans and note that truss quantities should be confirmed with the truss supplier.

Do you include framing labor?

Yes, we can price framing labor by floor, by square foot or by assembly. If you price your own labor, we deliver material quantities only.

How long does a lumber takeoff take?

Most lumber takeoffs are delivered within 24 to 48 hours of receiving complete plans, and larger multifamily projects may take longer.

How much does a lumber takeoff cost?

Lumber takeoffs are priced per project based on size and complexity, with a flat quote before work starts. Send your plans for a free quote.

Get a free quote

Have a framing project to estimate?

Tell us about the project and we will reply within one business day with a flat price and turnaround. You can also email your plans to info@nynmoestimating.com.

Emailinfo@nynmoestimating.com
ServingUSA · Australia · Canada · UK
Response timeWithin one business day

Request your estimate