Concrete Estimating Services

Accurate concrete takeoffs for footings, foundations, slabs, walls, rebar and formwork, priced at current regional rates and back in 24–48 hours, so you can bid more concrete work with confidence.

USAAUSTRALIACANADAUK
Concrete takeoff summaryCSI Division 03 · line-item format
Sample
ElementMeasured in
Spread & continuous footingsCYBy footing type, with step-downs
Slab on grade with thickened edgesCY · SFVapor barrier, base & finish included
Foundation & shear wallsSFCAFormwork contact area per pour
Reinforcement & embedsLBS · EABar size, mesh, dowels, anchor bolts
Waste factor shown on every lineDiv 03
1,000+Estimates delivered
12+Years of experience
24–48hTypical turnaround
100%CSI-formatted estimates
Concrete takeoff & estimating

Every cubic yard counted before you bid.

Concrete estimating services from NYNMO Estimating give concrete contractors, general contractors and developers an accurate count of every cubic yard, square foot of formwork and pound of reinforcement on a project before they bid. Our estimators quantify footings, foundation walls, slabs, columns, beams and flatwork directly from your structural and architectural drawings, then price materials and labor at current regional rates, so your number holds up on bid day whether the job is a single-family foundation or a multi-story commercial structure.

A concrete takeoff is only useful if it matches how you build. That is why each estimate is broken down by element and by pour instead of being lumped into one total. You see the concrete volume for every footing type, each slab on grade and elevated deck, and each wall pour, along with formwork contact area, reinforcement, embeds and finishing. You can check our numbers against the drawings, plan your pour sequence and send the quantities straight to your ready-mix supplier for pricing.

How we build a concrete estimate

Every concrete takeoff starts with a scope review of your structural, architectural and civil sheets, along with the general notes and specifications, so details like slab thickness changes, thickened edges, haunches and footing step-downs are not missed. Our estimators then measure each element on screen in PlanSwift and Bluebeam, calculate volumes with appropriate waste allowances, and apply material and labor pricing for your project's location. Mix design, PSI strength and finish requirements from the specifications are carried through to the line items, so the estimate reflects what the engineer actually specified rather than a generic assumption.

Scope we cover

Concrete elements we take off.

Order the full Division 03 scope, or only the elements your crews self-perform. Either way, each item is measured separately so nothing is averaged or buried.

01

Foundations

Spread, continuous and mat footings, grade beams, piers, pile caps and foundation walls, including step-downs on sloped sites.

02

Slabs & decks

Slabs on grade, thickened edges, elevated and post-tensioned decks, topping slabs, equipment pads and housekeeping pads.

03

Structural concrete

Columns, beams, shear walls, cast-in-place stairs, retaining walls and tilt-up panels, measured pour by pour.

04

Formwork

Contact area for every formed surface, with edge forms, bulkheads and blockouts listed so you can price your forming system.

05

Reinforcement

Rebar by bar size and weight, welded wire mesh, dowels, chairs, anchor bolts, hold-downs, sleeves and waterstops. See our rebar estimating page for detail.

06

Site & flatwork

Sidewalks, curbs and gutters, driveways, patios, aprons and site paving, plus sawcut joints, sealers and curing.

Residential & commercial

Concrete estimates for every project type.

ResidentialHomes, additions & flatwork

For residential projects we estimate foundations, basements, garage slabs, driveways, patios and retaining walls for homebuilders, foundation contractors and flatwork contractors. Takeoffs are organized by house plan and elevation, so production builders can reuse them across lots.

Commercial & industrialStructures, warehouses & sitework

For commercial and industrial work we cover spread and mat foundations, cast-in-place and tilt-up walls, conventional and post-tensioned elevated slabs, equipment pads and site concrete. If you only self-perform part of the scope, such as flatwork or foundations, we limit the takeoff to the elements you need.

Protect your margin

Concrete costs that are easy to miss.

Most concrete bids that go wrong do not fail on the slab volume. They fail on the items around it. Our takeoffs specifically account for the details that erode margin when they are left out:

  • Thickened slab edges and interior footings under bearing walls, which add volume that a simple area-times-thickness calculation misses.
  • Footing step-downs and changes in wall height across sloped sites, measured section by section rather than averaged.
  • Pump and placement requirements for elevated decks and hard-to-reach pours, flagged so you can price pumping separately.
  • Accessories and embeds such as anchor bolts, hold-downs, sleeves, waterstops, expansion joint material and chairs.
  • Finishing and protection, including control-joint sawcutting, curing compounds, sealers, and cold- or hot-weather protection where the specifications require it.

Each of these appears as its own line item, so nothing is buried in a contingency and you decide what to carry in your number.

How it works

Three steps from plans to a priced bid.

1
DAY 0

Send your plans

Upload your structural and architectural drawings, specifications and bid date, and tell us which concrete scope you self-perform.

2
TAKEOFF + PRICING

We take off and price

Our estimators measure every concrete element, apply waste factors and price materials and labor at regional rates.

3
24–48 HRS

Review and bid

You receive the Excel estimate and marked-up plans, request any changes and submit your bid.

Who it's for

Built for the people who bid concrete.

Our concrete estimating services suit anyone who needs reliable concrete quantities without tying up an in-house estimator for days.

Concrete subcontractors

Bid more foundation, flatwork and structural jobs each month without adding estimating staff.

General contractors

Check concrete sub quotes and carry a reliable budget number early in preconstruction.

Developers & architects

Understand foundation and structural costs before drawings are final.

Ready-mix suppliers

Quote volumes accurately by pour, with mix design and strength carried from the specs.

Why outsource

Why contractors outsource concrete takeoffs.

Measuring concrete by hand from a large structural set can take an estimator several days, and that time competes with running jobs, managing crews and chasing new work. Outsourcing the takeoff lets you respond to more bid invitations with the same team, while a second set of eyes on the drawings catches scope that is easy to overlook under deadline pressure.

Because each estimate is priced per project, you pay only for the bids you choose to pursue, with no estimating software licenses or salaried staff to carry between projects. Contractors who bid concrete every week can work with a dedicated estimator who learns their pricing and templates, and our bid preparation support helps turn the numbers into a complete proposal. If you need concrete as part of a full project budget, our construction cost estimating covers every trade, and our material takeoff services are available when you only need quantities.

FAQ

Common questions about concrete estimating.

Answers to what concrete and general contractors ask most before ordering a concrete takeoff.

How long does a concrete estimate take?

Most concrete takeoffs are delivered within 24 to 48 hours of receiving complete plans. Large multi-story commercial structures or incomplete drawing sets can take longer, and we confirm the turnaround time when we review your project.

What drawings do you need for a concrete takeoff?

Structural drawings are essential: the foundation plan, framing plans, sections, details and general notes. Architectural and civil sheets help us capture interior slabs, flatwork and site concrete, and the specifications let us carry the correct mix design, strength and finish requirements into the estimate.

Do your concrete estimates include rebar and formwork?

Yes. By default we quantify reinforcement by bar size and weight, wire mesh by area, and formwork as contact area for each element. If you subcontract rebar or forming, we can deliver concrete volumes only.

What waste factor do you use for concrete?

Waste allowances depend on the element. Footings and slabs on grade poured against earth usually carry a higher allowance than formed walls or elevated decks. We show the waste percentage on every line so you can adjust it to match your crews and supplier.

Do you estimate residential concrete work?

Yes. We estimate foundations, basements, garage slabs, driveways, patios, sidewalks and retaining walls for homebuilders, foundation contractors and flatwork contractors, as well as commercial and industrial concrete.

How much does a concrete estimate cost?

Concrete estimates are priced per project based on size and scope, and you receive a flat quote before any work begins. A residential foundation takeoff costs less than a multi-story commercial structure. Send us your plans for a free quote.

Get a free quote

Have a concrete project to estimate?

Tell us about the project and we will reply within one business day with a flat price and turnaround. You can also email your plans to info@nynmoestimating.com.

Emailinfo@nynmoestimating.com
ServingUSA · Australia · Canada · UK
Response timeWithin one business day

Request your estimate